About ETLOC Security
In conjunction with ETLOC Security ETLOC-30s & ETLOC-50 GPS units, the application offers a number of features for complex vehicle security.
– Immediate location of the vehicle
– Online monitoring of vehicle movement and its depiction on a map
– Sending SMS alerts in the event of a vehicle being towed
– Sending SMS alerts in case of unexpected vehicle movement
– Monitoring of entry and exit to and from designated zones
– Monitoring geofences
– Monitoring vehicle battery
– Monitoring the maximum preset speed
– The possibility to control selected circuits in the vehicle via a relay
– STOP – Safe shutdown of the engine
– and other useful features
Translation Loading...
Additional App Information
-
Category:
-
Latest Version:2.0.8
-
Released on:May 24, 2023
-
Developed by:EuroTact s.r.o.
-
Requires Android:Android 5.0+
-
Available on:
-
Report:
Show More














