About Car Temperature Thermometer
CAR Temperature Thermometer and Meter Measure temperature unit type Celsius (°C), Fahrenheit(°F) and Kelvin (°K). App measure the outside temperature and sense it into temperature and humidity which is based on your location.
Car Thermometer for car Temperature helps you to get estimate interior temperature of car or your environment. Simple thermometer measures ambient temperature outside. Car Temperature Thermometer app can displays the your current car temperature and weather temperature based on your current location.
Simple thermometer measures ambient temperature inside and outside .
Accurate thermometer shows outdoor and indoor temperature. (soon)
– Measures car temperature.
– For a better precision, thermometer uses integrated sensor to measure inside temperature.
– Localization allows to get outside temperature.
– Measures units are Celsius, Fahrenheit and kelvin.
– Indicates weather conditions as icons.
– Hygrometer measures humidity
How to check current temperature meter for room?
1. You just need to open the app and wait 7-10 seconds.
2. turn on the internet and the navigation device will return you the weather where you live
3. Check actual temperature in Celsius and Fahrenheit!
► Important!
*For the external thermometer to work, an internet connection is necessary to be able to collect the data.
*Because Thermometer – Hygrometer , Weather Now measure temperature and humidity according to location, please allow the turned position..
*Sometimes there is a need for calibration, so please leave your phone on a flat place, without touching it about 5-10 minutes. Then it will give you the correct indoor and outdoor temperature.
*Keep away from too hot or too cold objects for better results.
*When your phone is in use the battery warms up and temperature is measured higher then real.
Additional App Information
-
Category:
-
Latest Version:1.15.92
-
Released on:Dec 6, 2020
-
Developed by:Studio XYZ
-
Requires Android:Android 5.0+
-
Available on:
-
Report:














