About Dynamite Train
O, oh! The train can’t stop! There’s just one way to make the train stop. That’s by blowing up the bridge when the train is riding on it. Place the dynamite on different places and blow up the bridge at the right time. You are on a mission to stop the train. You must grab your bag of dynamite and place them on the bridges to make it explode. Then sit back and watch the show! Be sure to place the dynamite in a good place and not run out.
If you need a break of everything and everyone around you, go and set your anger free with this cool Dynamite Train game. Play an awesome game and complete all levels. The smile will come back on your face in no time. Place the dynamites on the bridges and make the train fall into the hollow to earn some points. For extra points and bonuses you will have to do this very fast and thus earn a higher time bonus. The aim of the game is to unlock all 24 levels, which are your challenge. Roll your mouse over the screen to see the image from another view or use the plus and minus icons to zoom in/ out. There are four different types of dynamites that can be attached and used to destroy either wood, steel, ropes or stones. At the top of your screen are several indicators. Between them are the dynamites that are available in a certain order. Click on an appropriate part of the bridge and continue with the next dynamite. You can replace dynamite simply by clicking it again and drag it where you want. When you place all dynamites click the Play button (on the upper right corner) to start the bridge. Then click the detonator to blow up the bridge and destroy the train. Wish you good luck with your total score.
You are on a mission to stop the train. You must grab your bag of dynamite and place them on the bridges to make it explode. Then sit back and watch the show! Be sure to place the dynamite in a good place and not run out.
Game developed by gametornado.
Additional App Information
-
Category:
-
Latest Version:19
-
Released on:May 12, 2013
-
Developed by:Gametornado
-
Requires Android:Android 4.4+
-
Available on:
-
Report:













