About Leaf and Pebble
Pass the time with the simple tic tac toe styled move based game! Leaf and Pebble gives the flavor of the tic tac toe and chess bundled together making way for a fun based strategy game.
How to play :
1. You play as the Leaf.
2. Leaves and pebbles can be placed on the slots which are on the edges and the middle of the lines of the grid.
3. Get all the leaves to the grid.
4. For each of the turn, move the leaf to the adjacent side slot.
5. Bring the leaves to a straight line to gain a point.
6. The first to get 5 points wins!
Difficulty : Moderate
P.S: Maximum intelligence is not coded to have a balanced difficulty.
Translation Loading...
Additional App Information
-
Category:
-
Latest Version:1.1
-
Released on:Feb 6, 2017
-
Developed by:Sidharth J
-
Requires Android:Android 2.3+
-
Available on:
-
Report:
Show More





