Magic War-3V3(RTS)

Magic War-3V3(RTS) icon

1000+ Installs


1.0.6 by Xu Min 0124


Jun 13, 2023

About Magic War-3V3(RTS)

This is a magic-style real-time strategy (RTS) mobile game. It collects resources, builds buildings, produces troops, develops technology, and finally destroys the opponent to win.
The game mainly has the following functions:
1. Checkpoint: mainly plays the role of teaching and practice.
2. Networked multiplayer battle: the game realizes global networking and real-time matching.
3. Watch the game online, even if the game has already started, you can watch the game halfway.
4. Video playback: Players can upload each round of the battle to the server and share it with other players to watch.
5. Map Editor: Players can make their own maps for use in battle. (However, this function is not available yet)

There are two kinds of resources in the game, wood and gold, which are obtained by farmers logging and mining respectively.
The base can be upgraded by 3 levels, and each level will have new arms, buildings, and technologies. While developing the economy and upgrading technology, players must also develop the military to fight against the enemy.
The main military buildings in the game include: walls, arrow towers, magic towers, turrets, electric towers, barracks, shooting ranges, temples, castles, factories, dragon bases, missile bases, etc.
The main heroes are: Giant, Great Swordsman, Bull Demon King, Thor, Orc Mage, Mech Warrior, etc. New heroes and arms will be introduced continuously in future updates.
Before the start of the game, you need to choose a hero. After the start, depending on the hero you choose, the arms that can be produced will be different, but the main ones are: swordsman, knight, archer, trebuchet, chariot, mage, Witch doctors, airships, giant bears, bats, spiders, discharge soldiers, etc.

Playing rts on mobile phones is generally not easy to get started due to operational limitations. For this reason, we have developed some AI to assist players Get started with the game, when you are a new player, you can choose some AI to help you save operations, for example, the AI for producing farmers, for example, adjust the AI for farmers to collect different resources, for example, building houses, lumberyards, quarries, etc. AI, the player’s use of “ai-assisted operation” is a double-edged sword. It is possible that the ai will not completely follow the player’s thinking. Therefore, as the player becomes proficient in the game, they will generally give up using ai gradually.

In addition, the upper limit of the battle population will increase slightly with the increase of the account level, which makes the old account more meaningful.

The game is still in the stage of continuous upgrading, we will continue to improve functions and launch new modules. Thank you for your support. If you need it, please contact us via the following email:
[email protected]

Translation Loading...

Additional App Information

Show More